Total financial control.

Construction cost reporting and loan monitoring.

Eliminate uncertainty from your projects. Our loan monitoring and cost reports enforce rigorous tracking of construction progress, and full trust between stakeholders and financial institutions.

Tower cranes on a building under construction

Built for Project Developers Under Lender Conditions

If your construction financing requires an independent cost consultant to monitor draws, Munera Diligence is built around that obligation.

Multi-Residential (Rental & Condominium)

Unit-by-unit progress review, statutory holdback tracking, and draw reporting aligned to your lender's schedule.

Commercial & Retail

Tenant improvement and base-building coordination tracked alongside your construction loan draws.

Industrial & Logistics

Early review of long-lead equipment and structural milestones that carry the heaviest capital exposure.

Civil & Infrastructure

Cost and progress oversight suited to public and institutional procurement requirements.

Cost Reporting & Loan Monitoring

Book a Consultation

Tell us about your project and financing conditions — we'll scope an independent cost reporting engagement around your draw schedule.

  • Scoping call within one business day
  • A reporting mandate scoped to your lender's requirements
  • Monthly reviews aligned to your draw schedule

How a Draw Works With Munera Diligence

Each engagement follows the same disciplined cycle, from financial close through your final draw.

1. Initial Due Diligence Report

Before the first draw, we review the developer pro forma, design drawings, permits, prime contracts, and construction schedule, and confirm the equity injection and loan facility are sufficient to complete the project.

2. Monthly Site & Draw Review

On a cycle aligned to your draw schedule, we visit the site and review progress against the general contractor's payment application. The cadence tightens to bi-weekly at the first signs of slippage, so variances reach you before the monthly report — not after.

3. Payment Request Analysis

We check the claimed percentages against the schedule of values and verify change order requests before any recommendation is made.

4. Dénonciations & Quittances Review

We track subcontractor notices of contract (dénonciations) and releases (quittances) alongside statutory holdbacks (retenues), so your lender has a clear record.

5. Draw Recommendation to Your Lender

Each cycle closes with a formal recommendation your lender's credit team can act on, keeping your disbursement process moving.

Why Project Developers Work With Munera

Munera Diligence is built around the information your lender actually needs, delivered on a schedule your project can rely on.

A Managed Solution, Not Just a Tool

Platforms automate reconciliation. We go further: a team of accredited professionals signs every recommendation your lender can rely on.

Costs Incurred and Real Progress

Traditional reports confirm costs incurred — not real progress. Ours verify both.

Protection Against Litigation

A construction dispute typically costs 10 to 20% of the amount claimed in legal fees. Rigorous documentation from day one is your best protection.

Quebec-Specific Reporting

Our reviews reflect Quebec construction practice, including holdbacks, dénonciations, and quittances, so nothing is lost in translation with your lender.

A Dedicated Team

You work with the same reviewers draw after draw, not a rotating roster that relearns your project every month.

A Report Lenders Can Act On

Every recommendation is structured around what a credit team needs to approve a disbursement, not a generic status update. Unlike an automated calculation, every recommendation is signed by a professional who stands behind it.

Our reporting draws on professionals holding AEÉCQ (Association des estimateurs et économistes de la construction du Québec), OIQ (Ordre des ingénieurs du Québec), and IMAQ (Institut de médiation et d'arbitrage du Québec) designations.

What's In a Munera Diligence Report

Here's exactly what each draw report contains.

Project & Financing Summary

Current draw number, approved budget, equity injected to date, and loan facility remaining.

Schedule of Values Reconciliation

Contractor's claimed percentages checked line by line against the approved schedule of values.

Site Observations

What was physically reviewed on site during the visit, including drone inspections and lidar surveys to document the site, and how it compares to what's being billed.

Holdback & Lien Status

Statutory holdbacks, outstanding dénonciations, and quittances collected to date.

Cost to Complete

Remaining budget required to finish the project, measured against funds remaining.

Draw Recommendation

A clear recommendation your lender's credit team can act on for this disbursement.

The exact structure is adapted to your lender's requirements during your consultation.

Coming Soon: An Internal Platform Behind the Reports

We're building a dedicated platform for project developers to support the Munera Diligence process, designed to give a clean handoff into every draw report we issue and optimize internal project management.

Coming soon

Work-Progress Tracking

Work-progress tracking across site documentation and reality capture, comparing as-built conditions against the as-planned schedule.

Coming soon

Document Reconciliation

Document reconciliation across contracts, invoices, and schedules of values.

Coming soon

Centralized Cost Control

Centralized cost control feeding directly into each draw report.

Frequently Asked Questions

Common questions from project developers and from lenders reviewing our reports.

How long does a draw review take?

Reviews are scheduled on a monthly cycle aligned to your project's draw schedule, so your lender has what it needs for each disbursement decision.

Can Munera Diligence work alongside our existing consultant?

Yes. Many developers bring us in to support an existing relationship, or to transition from one consultant to another between draws.

What do you need from us to get started?

Your pro forma, design drawings, permits, prime contracts, and construction schedule. We'll walk through exactly what's needed during your consultation.

What does your consultant verify on each visit?

We review the general contractor's payment application against the schedule of values, verify change order requests, and confirm statutory holdbacks before issuing a draw recommendation.

Do your reports track dénonciations and quittances?

Yes, subcontractor notices of contract and releases are reviewed as part of our standard holdback and lien status review.

Which regions do you cover?

We focus on Quebec construction projects, and can scope coverage in other Canadian jurisdictions on request.

Can we use Munera Diligence if we already use a reconciliation or site-tracking platform?

Yes. Those tools speed up document collection and reconciliation, but a draw recommendation addressed to your lender still needs an accredited professional's signature. We can incorporate data from your existing platform into our review process.